Atlantis on site Detention tank OSD at Orange Grove Villas , Sailsbury Brisbane.

 

On Site Detention Tank System (OSD)

This project incorporated the Atlantis Flo-Tank® detention tank system and a custom pre stormwater filtration device.

Designed to reduce post development flows to Oxley Creek .It consists of an offline 35 cubic metre Atlantis stormwater detention tank receiving water through an Atlantis designed twin pit stormwater filter to help remove debris from entering the Atlantis Flo-Tank® tank modules.

Cost Effective Stormwater Gross Pollutant Trap (GPT)

The twin pit design is made from readily available standard concrete pits and pvc plumbing fittings and is highly effective at removing both gross pollutants and sedimentation from entering the tank system.

Atlantis Low Cost GPT Gross Pollutant Trap

More Atlantis Projects

2017: RAAF Airport Upgrade

December 6th, 2017|0 Comments

This project is part of a $1.5 billion upgrade of RAAF Base William Town including a 600m extension of the runway and addition of extra taxiways and buildings.

The project was to provide underground infiltration channels […]

2013: Silkstone State School Parking Bays

December 5th, 2017|0 Comments

At Silkstone State school Qld. a contentious issue arose. The school required car parking and a sealed one at that. But in the proposed car park was a huge old tree. The tree could be […]

2013: Residential Green Wall

December 5th, 2017|0 Comments

Customer had a bench seat on a corner of his back verandah. It was decided to have an Atlantis® Gro-wall® vertical garden behind the bench seat. So a Gro-wall ® vertical garden was constructed directly […]

2017: The Titans Training Center

December 5th, 2017|0 Comments

After two years operating the football club out of a temporary home at the Burleigh Bears, the Gold Coast Titans moved into their new home, a purpose built training and administration facility on the grounds […]